total descendants::1 total children::1 |
nejako mi tie odhady pridu male, metro za 3 miliardy?! v NYC jeden tunel/2-3 stanice stala uz 4-5 mld a robila sa 10+ rokov.. "The first phase of the line, consisting of the 96th Street, 86th Street and 72nd Street stations, as well as two miles (3.2 km) of tunnel, cost $4.45 billion. A 1.5-mile (2.4 km), $6 billion second phase from 96th to 125th Streets is in planning and is expected to open by 2027–2029." u nas low cost veci stavat je imho absolutne nerealne lebo korupcia plus v plne rozbehnutom meste stavat metro bude vzdy drahsie ako sa ocakava cela BA imho desiatky mld.. IMO tie elektrickove trate posilnit je lepsie riesenie - Zurich je porovnatelny s BA, ma mrte elektriciek/trolejbusov. Metro nechyba imho/ciastocne nahradene systemom S-bahn ktore obsluhuju aj okolite mestecka/celu aglomeraciu. |
| |||||||||||||||||||||||